The University of Texas at Arlington

 

     Center for Underground Infrastructure Research and Education

                                 www.CUIRE.org                     

                                                                                                  Phone: (817) 272- 0507       Fax: (817) 272- 2630

                                                                                                                 E-mail: najafi@uta.edu

                                                                                                       

                                            Sewer Survey  

Project Overview

This project will examine actual and projected cost of U.S. sewer infrastructure. The summary of the results will be published. Your assistance in completing this survey will be kept confidential. We greatly appreciate your help and we will send you the results at the conclusion of the study scheduled for summer 2008.

If you have any question or concern, please feel free to contact the Principal Investigator of this project, Dr. Mohammad Najafi directly at 817-272-0507 or  najafi@uta.edu

 Contact  Person’s Name      
 Name of Corporation   
 Address  Street      Number   
 City         State    Zip Code 
 E-mail  
 Phone   Fax   

 

     Have you responded to our survey last year?     YES               NO

       If your answer is YES and there is no major changes in PART A, please go to PART B.

       If your answer is NO please start from PART A.

PART A: SYSTEM OVERVIEW

 1) What is the population of the area served by your sanitary sewer system?  

     The above answer is accurate within:   ± 5%          ± 10%           ± 20%

 

 2) What is the total length of your sanitary sewer system?  ft.

                                                                                                     Or, mile.

     The above answer is accurate within:   ± 5%          ± 10%           ± 20%

 

 3) What percentage of your total length of sanitary sewer system

     (from Question 2 above) is large diameter (more than 36 in.)?   %

     The above answer is accurate within:   ± 5%          ± 10%           ± 20%

 

 4) What percentage of your large diameter sanitary sewer system is

    (from Question 3 above) egg or elliptical (not round) shape?  %

    The above answer is accurate within:   ± 5%          ± 10%           ± 20%

 

 5) What percentage of your sanitary sewer system is in need of immediate?

     Repair or renewal/replacement ?   %

    The above answer is accurate within:   ± 5%          ± 10%           ± 20%

 

 6) What is the population of the area served by your storm sewer system?  

      The above answer is accurate within:   ± 5%          ± 10%           ± 20%

 

 7) What is the total length of your storm sewer system? ft.

                                                                                                 Or, mile.

      The above answer is accurate within:   ± 5%          ± 10%           ± 20%

 

 8) What percentage of your total length of storm sewer system

     (from Question 6 above) is large diameter (more than 36 in.)?  %

      The above answer is accurate within:   ± 5%          ± 10%           ± 20%

 

 9) What percentage of your large diameter storm sewer system is

     (from Question 7 above) egg or elliptical (not round) shape?  %

      The above answer is accurate within:   ± 5%          ± 10%           ± 20%

 

10) What percentage of your storm sewer system is in need of immediate?

      Repair or renewal/replacement?   %

      The above answer is accurate within:   ± 5%          ± 10%           ± 20%

 

 11) What are the biggest problems facing the repair/replacement and new construction of your system

        (check all that apply)?

Lack of funding

Lack of suitable technology (Technology Provider, Contractors)

Lack of information on available construction methods

Other (please specify)

 12) What are your concerns when using trenchless methods (check all that apply)?

                              Lack of funding

Lack of confidence in technology

Lack of QA/QC program

Uncertainty in life expectancy of Proposed Technology

Availability of qualified contractors

Other (please specify) 

 13) Which reference standard(s) do you use for pipeline repair or renewal/replacement

        (check all that applies)?

ASTM

ASCE

AWWA

WEF

Greenbook

NASSCO

Others (please specify)   

 

14) Are there any pipe materials that are limited or restricted for use in your system?

Yes

No

If answer to Q-14 isNo’, then proceed to Q-17.

15) What type(s) of pipe material(s) or repair or renewal/replacement method is/are banned or 

       restricted, if any?

   

         16) What is/are the reason(s) for restriction of pipe materials or repair or renewal/replacement in

                Q 15?

  

 

PART B: RENEWAL

17) How many linear feet of sewer pipe are under repair or renewal/replacement  using the

      following methods, and what the budget is during?

*Please provide the total cost if individual cost information is not available    

                                                                

During year 2007

During year 2008

During year 2009

Method

(ft)

($)

(ft)

($)

(ft)

($)

Cured-in-Place Pipe (CIPP)
Fold-and-Form Pipe
Pipe Bursting
Sliplining
Open-Cut
Point Repairs
Grouting
Spiral Lock Technology
Other (please specify)
Total                 

                    The above answer is accurate within:   ± 5%          ± 10%           ± 20%

 

18) What is your total budget for lateral repair/replacement during?

Year 2007 (Actual) :            $

Year 2008 (Actual/Budget): $

Year 2009 (Budget):            $

The above answer is accurate within:   ± 5%          ± 10%           ± 20%

 

        19) When selecting a specific renewal method, do you consider or design for ground movements

               (such as caused by heavy traffic, railroad, or   natural causes such as earthquakes)?

                  Yes                  No

             Please briefly explain why or why not:

           

 

       20) On the average, the depth of water table in your district/municipality fluctuates in the following

             ranges (check all that apply):

             0 to 5 ft                              5 to 10 ft                           10 to 15 ft                          20 ft or more

             Other, please specify