THECB Research Expenditure Award Transparency
| PI's Name | Department Name | Project Title | Award | Sponsor | Program | CFDA# | Start Date | End Date | |||
| Hegar | Rebecca | School of Social Work | Child Care Administrator Exam | $ 49,956 | Texas Department of Protective and Regulatory Services | 20-Mar-04 | 31-Dec-05 | ||||
| Shirazi | Behrooz | Computer Science Engineering | CISE: Research Experiences for Undergraduates in Distributed Rational Agents | $ 8,000 | National Science Foundation | CISE | 47.070 | 2-Apr-03 | 31-Mar-04 | ||
| Liu | Hanli | Biomedical Engineering | Assessing Vascular Oxygen Dynamics for Breast Tumor Prognosis | $ 100,000 | Department of Defense | 12.420 | 1-Oct-02 | 30-Sep-05 | |||
| Elsenbaumer | Ronald | Office of VP for Research and IT | Nanostructured Magnetic, Electronic, and Optical Materials and Devices | $2,350,000 | Defence Advanced Research Projects Agency (DARPA) | 12.300 | 1-Jul-03 | 30-Jun-05 | |||
| Holder | Lawrence | Computer Science Engineering | Graph-Based Structural Pattern Learning | $ 254,335 | Defence Advanced Research Projects Agency (DARPA) | 12.910 | 14-Jan-03 | 31-Dec-04 | |||
| Chakravarthy | Sharma | Computer Science Engineering | Facilitating Intelligent Sharing of Information for Decision Making over Distributed Heterogeneous Network Centric Environments | $ 60,000 | Air Force Office of Scientific Research | 12.800 | 18-Jun-02 | 18-Sep-03 | |||
| Butler | Donald | Electrical Engineering | Semicondicting YBaCuO Uncooled Focal Plane Arrays | $ 181,806 | Air Force Office of Scientific Research | 12.800 | 1-Jan-03 | 31-Dec-04 | |||
| Elsenbaumer | Ronald | Office of VP for Research and IT | Nano Technology Instrumentation Acquisition | $1,916,500 | Department of the Air Force | 12.800 | 1-May-04 | 30-Apr-05 | |||
| Liu | J.Ping | Physics | Novel Approaches to the Synthesis, Processing and Applications of Nanocomposite Magnets | $2,259,708 | Army Research Office | 12.910 | 1-Sep-02 | 19-Mar-05 | |||
| Liu | Hanli | Biomedical Engineering | Non-Invasive Monitoring of Breast Tumor Oxygenation: A Key to Tumor Therapy Planning and Tumor Prognosis | $ 95,851 | U.S. Army Medical Research and Material Command | 12.420 | 1-Sep-02 | 31-Aug-04 | |||
| Lewis | Frank | ARRI | Nearly Optimal Solution of HJB Equation Using Neural Networks: Applications to Control DoD Systems and MEMS Assembly | $ 120,000 | Army Research Office | 12.431 | 1-Jan-03 | 31-Dec-04 | |||
| Kim | Jae | Biomedical Engineering | Monitoring of Breast Tumor Response to Local Chemotherapeutic Agent Delivered by Biodegradable Fibers | $ 89,975 | Department of Defense | 12.420 | 1-May-03 | 30-Apr-06 | |||
| Gu | Yueqing | Biomedical Engineering | Non-invasive Monitoring for Optimization of Therapeutic Drug Delivery by Biodegradable Fiber to Prostate Tumor | $ 326,756 | Department of Defense | 12.420 | 1-Feb-04 | 31-Jan-07 | |||
| Xia | Mengna | Biomedical Engineering | Simultaneous Monitoring of Vascular Oxygenation and Tissue Oxygen Tension of Breast Tumors Under Hyperbaric Oxygen Exposure | $ 89,994 | Department of Defense | 12.420 | 5-Mar-04 | 8-Apr-07 | |||
| Kenarangui | Rasool | Electrical Engineering | Coordination Study for Whitney Hydro-Electric Power Plant. | $ 35,000 | U.S. Army Corps of Engineers | 12.114 | 9-Apr-04 | 30-Sep-04 | |||
| Puppala | Anand | Civil Engineering | Investigations to Develop Field Stabilization Methods to Mitigate Desiccation Cracks in Order to Reduce Slope and Embankment Failures | $ 65,000 | U.S. Army Corps of Engineers | 27-Apr-04 | 30-Sep-04 | ||||
| Kenarangui | Rasool | Electrical Engineering | Whitney Hydro-electric Power Plant Relay Installation | $ 77,000 | U.S. Army Corps of Engineers | 12.114 | 24-Aug-04 | 31-May-05 | |||
| Kenarangui | Rasool | Electrical Engineering | Whitney Hydro-electric Power Plants' Generators High Impedance Neutral Grounding | $ 35,000 | U.S. Army Corps of Engineers | 12.114 | 11-Aug-04 | 15-May-05 | |||
| Liang | Qilian | Electrical Engineering | Energy Efficient Wireless Sensor Networks for Future Combat Systems Using Fuzzy Logic | $ 141,278 | Office of Naval Research | 12.300 | 1-Jun-03 | 31-May-06 | |||
| Liu | Chaoqun | Mathematics | LES for Near Field Wakes Behind Juncture of Wing and Plate | $ 85,000 | Office of Naval Research | 12.300 | 1-Apr-03 | 31-Mar-06 | |||
| Sharma | Suresh | Physics | Investigations of the Electronic Structure and Superconductivity in Newly Predicted Metallic Crystalline Carbon | $ 115,449 | Department of Energy | 81.049 | 15-Aug-03 | 14-Aug-05 | |||
| White | Andrew | Physics | Research in Experimental Elementary Particle Physics | $1,050,000 | Department of Energy | 81.049 | 1-Nov-02 | 31-Jan-05 | |||
| Dulikravich | George | Mechanical & Aerospace Eng. | Stochastic Multi-Objective Optimization of Heat and Corrosion Resistant Alloy Properties | $ 116,619 | Department of Energy | 81.086 | 1-Jan-03 | 31-Dec-03 | |||
| Brandt | Andrew | Physics | A Forward Proton Detector for the Dzero Experiment | $ 198,000 | Department of Energy | Dzero | 81.049 | 1-Nov-01 | 31-Jan-05 | ||
| Yu | Jaehoon | Physics | Development of New Hadronic Calorimeter Technology | $ 150,000 | Department of Energy | 81.049 | 1-Nov-01 | 31-Jan-05 | |||
| Harris | Kendall | Mechanical & Aerospace Eng. | Industrial Assessment Center | $ 442,270 | Department of Energy | IAC Program | 81.086 | 2-Sep-02 | 30-Nov-06 | ||
| Ray | Asok | Physics | A Fully Relativistic Density Functional Study of the Role of 5f Electrons in Chemial Bonding in Transuranium Elements | $ 99,000 | Department of Energy | 81.049 | 1-Sep-03 | 31-Aug-06 | |||
| Rajeshwar | Krishnan | Chemistry | Spatially Directed and Photoassisted Electrosynthesis of Semiconductors and Nanocomposites | $ 100,354 | Department of Energy | 81.049 | 15-Sep-04 | 14-Oct-05 | |||
| Rajeshwar | Krishnan | Chemistry | Synthesis and Photoelectrochemistry of Composite Semi-Conductor Films | $ 85,000 | Department of Energy | 81.049 | 15-Apr-03 | 14-Sep-04 | |||
| De | Kaushik | Physics | U.S. ATLAS Acceleration Funding (MoU No. 16/98acc) | $ 82,000 | Brookhaven National Laboratory | 2-Sep-98 | 30-Sep-03 | ||||
| Brandt | Andrew | Physics | A Forward Proton Detector for the Dzero Experiment | $ 39,000 | Department of Energy | 81.049 | 1-Nov-00 | 31-Jan-04 | |||
| Brandt | Andrew | Physics | A Forward Proton Detector for the Dzero Experiment | $ 25,000 | Department of Energy | Dzero | 81.049 | 2-Nov-01 | 31-Jan-04 | ||
| De | Kaushik | Physics | ATLAS Experiment Research & Computing | $ 89,800 | Brookhaven National Laboratory | 81.049 | 1-Feb-04 | 31-Dec-12 | |||
| Yu | Jaehoon | Physics | Student Exchange Program for DO Grid Development | $ 65,523 | Fermi National Accelerator Lab | 81.049 | 30-Aug-03 | 15-Aug-04 | |||
| Yu | Jaehoon | Physics | UTA-FNAL CSE Master's Student Exchange Program | $ 48,334 | Fermi National Accelerator Lab | 1-Sep-04 | 13-May-05 | ||||
| Kinsel | Gary | Chemistry | Analytical Applications of MALDI Mass Spectrometry to the Study of Surface-Protein Interactions | $ 80,000 | National Science Foundation | 47.049 | 1-Feb-02 | 31-Jan-04 | |||
| Dulikravich | George | Mathematics | Research in Robust and Efficient Comput, Meth for PDE's | $ 103,089 | National Science Foundation | 47.049 | 1-Aug-00 | 31-Jul-04 | |||
| Cook | Diane | Computer Science Engineering | Integrating Intelligent Agent and Wireless Computing Research into the Undergraduate Curriculum | $ 329,915 | National Science Foundation | 47.070 | 1-Jan-01 | 31-Dec-04 | |||
| Rajeshwar | Krishnan | Chemistry | Cathodic Electrosynthesis of Metal Oxide Films | $ 4,640 | National Science Foundation | 47.075 | 1-Feb-03 | 31-Aug-04 | |||
| Musielak | Z. | Physics | Theoretical Models of the Solar Chromosphere, Transition Region and Wind | $ 147,335 | National Science Foundation | 47.050 | 1-Apr-03 | 31-Mar-05 | |||
| Puppala | Anand | Civil Engineering | Experimental Investigations of Chemically Treated Sulfate Soils for Fundamental Understanding of Heaving Mechanisms | $ 202,191 | National Science Foundation | 47.041 | 15-May-01 | 30-Apr-05 | |||
| Cook | Diane | Computer Science Engineering | MRI: Instrumentation for Intelligent Agent and Wireless Computing Research | $ 426,284 | National Science Foundation | 47.070 | 1-Sep-01 | 31-Aug-05 | |||
| Puppala | Anand | Civil Engineering | Experimental Investigations of Chemically Treated Sulfate Soils for Fundamental Understanding of Heaving Mechanisms | $ 30,000 | National Science Foundation | 47.041 | 20-Nov-02 | 30-Apr-05 | |||
| Puppala | Anand | Civil Engineering | REU Supplement to NSF Project 0100255 | $ 5,625 | National Science Foundation | 47.041 | 15-May-01 | 30-Apr-04 | |||
| Hillstrom | Anne | Psychology | CAREER: The Role of Spatiotemporal and Identity Continuity in Object Constancy | $ 61,294 | National Science Foundation | CAREER | 47.075 | 1-Aug-03 | 31-Jul-04 | ||
| MacDonnell | Frederick | Chemistry | Studies of Tertiary and Quaternary Structure in Rigid Abiotic Supramolecular Assemblies | $ 88,437 | National Science Foundation | 47.049 | 1-Aug-03 | 31-Jul-04 | |||
| Campbell | Jonathan | Biology | The Amphibians/Reptiles and their Parasites of Mexico-A Megadiverse Country | $ 206,257 | National Science Foundation | 47.074 | 1-Sep-03 | 28-Feb-05 | |||
| Cook | Diane | Computer Science Engineering | Graph-Based Data Mining | $ 442,487 | National Science Foundation | 47.070 | 1-Sep-01 | 31-Aug-05 | |||
| Chakravarthy | Sharma | Computer Science Engineering | Selective Just-in-Time(JIT) Information Progagation in Large networ-Centric Environments | $ 80,000 | National Science Foundation | 47.070 | 1-Sep-03 | 31-Aug-05 | |||
| Cook | Diane | Computer Science Engineering | ITR/IM+SI - MavHome: Development of an Intelligent Home Environment | $ 412,266 | National Science Foundation | 47.070 | 23-May-03 | 31-Aug-05 | |||
| Chippindale | P | Biology | Phylogenetic relationships and montane species richness in plethodontid salamanders | $ 92,963 | National Science Foundation | 47.074 | 1-Feb-03 | 31-Jan-05 | |||
| Shirazi | Behrooz | Computer Science Engineering | CISE: Research Experiences for Undergraduates in Distributed Rational Agents | $ 111,963 | National Science Foundation | CISE | 47.070 | 1-Apr-03 | 31-Mar-05 | ||
| Cook | Diane | Computer Science Engineering | MavHome: An Intelligent Home Environment - REU Supplement Request | $ 8,000 | National Science Foundation | 47.070 | 5-Apr-02 | 31-Aug-05 | |||
| Kumar | Mohan | Computer Science Engineering | Pervasive Information Communities Organization (PICO): A Framework for Internet Services of the Future | $ 426,361 | National Science Foundation | 47.070 | 1-Jun-02 | 31-May-06 | |||
| Passy | Sophia | Biology | MRI Acquisition of a confocal laser scanning microscope | $ 287,636 | National Science Foundation | MRI | 47.074 | 15-Jun-02 | 31-May-05 | ||
| Chippindale | P | Biology | Dissertation Research: Systematics and phylogeography of the Eurycea multiplicata complex | $ 9,400 | National Science Foundation | Dissertation Improvement Grant | 47.074 | 1-Aug-02 | 31-Jul-04 | ||
| Lewis | Frank | ARRI | Nonlinear Network Structure for Dynamic System Control | $ 66,667 | National Science Foundation | 47.041 | 15-Jun-03 | 31-May-04 | |||
| Shirazi | Behrooz | Computer Science Engineering | CISE: Research Experiences for Undergraduates in Distributed Rational Agents | $ 8,000 | National Science Foundation | CISE | 47.070 | 1-Apr-04 | 31-Mar-05 | ||
| Chippindale | P | Biology | Dissertation Research: Phylogeography and population genetics of the dyeing poison-dart frog (Dendrobates tinctorius) | $ 27,508 | National Science Foundation | Dissertation Improvement Grant | 47.074 | 1-Aug-02 | 31-Jul-04 | ||
| Hoyos | Laureano | Civil Engineering | Development of a strain temperature suction controlled true triaxial testing device for modeling unsaturated soil behavior under multi-axial | $ 272,178 | National Science Foundation | MRI | 47.041 | 1-Aug-02 | 31-Jul-06 | ||
| Huber | Manfred | Computer Science Engineering | CRCD: An Active Collaborative Learning Program in Smart Technologies | $ 161,926 | National Science Foundation | CRCD | 47.070 | 15-Aug-02 | 31-Jul-05 | ||
| Gough | Laura | Biology | Advance Fellows Award: Continuing and Enhancing a Career in Arctic Research and Education | $ 298,294 | National Science Foundation | ADVANCE | 47.078 | 1-Jun-03 | 31-May-05 | ||
| Lewis | Frank | ARRI | Bi-National Effort on Distributed Manufacturing Supervisory Control Systems | $ 79,978 | National Science Foundation | CONACyT Collaborative Rsrch Op | 47.041 | 15-Aug-02 | 31-Jul-05 | ||
| Vancliff | Michaela | Mathematics | Regular Algebras | $ 66,443 | National Science Foundation | 47.049 | 15-Aug-03 | 31-Jul-05 | |||
| Chakravarthy | Sharma | Computer Science Engineering | Acquisition of High-Performance Computing and Storage Infrastructure at UTA | $ 950,000 | National Science Foundation | MRI | 47.000 | 1-Sep-02 | 31-Aug-05 | ||
| Celik-Butler | Zeynep | Electrical Engineering | Micomachined Infrared Sensors for Flexible Substrates | $ 221,803 | National Science Foundation | 47.041 | 1-Sep-02 | 31-Dec-04 | |||
| Lewis | Frank | ARRI | GOALI-MEMS Based Sensors and Actuators for Medical and Biological Applications | $ 235,098 | National Science Foundation | 47.041 | 1-Oct-02 | 30-Sep-05 | |||
| Abolmaali | Ali | Civil Engineering | CCLI-EMD CCLI-EMD Development of Web-based Real Time Virtual Model Based Simulation Laboratory for Soil-structure Interaction Problems | $ 74,382 | National Science Foundation | CCLI | 47.076 | 15-Jan-03 | 31-Dec-04 | ||
| Abolmaali | Ali | Civil Engineering | REU-Site Performance Evaluation of Civil Infrastructure Systems | $ 84,152 | National Science Foundation | 47.041 | 1-Feb-03 | 31-Jan-05 | |||
| Johannesson | Karen | Geology | Quantifying Rare Earth Element Transport in Aquifers Using Field, Laboratory, and Numerical Approaches | $ 213,453 | National Science Foundation | 47.050 | 15-Aug-02 | 31-Mar-05 | |||
| Abolmaali | Ali | Civil Engineering | REU-Site Performance Evaluation of Civil Infrastructure Systems | $ 7,200 | National Science Foundation | 47.041 | 2-Feb-03 | 31-Jan-05 | |||
| Gough | Laura | Biology | Collaborative Research: Moist Acidic vs. Non-acidic Tundra: Why Does the Vegetation Composition Differ and What are the Consequences fo | $ 50,618 | National Science Foundation | 47.074 | 1-Sep-02 | 31-Oct-03 | |||
| Elsenbaumer | Ronald | Chemistry | An Upgrade of a 300 MHz NMR Spectrometer for Teaching and Research | $ 164,950 | National Science Foundation | 47.049 | 15-Feb-03 | 28-Feb-06 | |||
| Kumar | Mohan | Computer Science Engineering | REU Supplement to Pervasive Information Community Organization (PICO): A Framework for Internet Services of the Future | $ 12,500 | National Science Foundation | 47.070 | 13-May-03 | 31-May-05 | |||
| Dias | Rasika | Chemistry | A Greener, Controllable Metal Mediated Route to Polyanilines | $ 260,000 | National Science Foundation | 47.049 | 15-Jun-03 | 30-May-05 | |||
| Liao | Guojun | Mathematics | Collaborative Research: Mesh Free Least Squares Particle FEM | $ 61,710 | National Science Foundation | 47.000 | 1-Jul-03 | 30-Jun-06 | |||
| Kinsel | Gary | Chemistry | Protein-surface Interactions: MALDI MS Based Fundamental Studies and Bioselective Probe Development | $ 122,000 | National Science Foundation | 47.049 | 15-Jul-03 | 30-Jun-04 | |||
| Gornet | Ruth | Mathematics | Isospectrality: Length vs. Laplace Sepctra and Isospectral Families | $ 60,197 | National Science Foundation | 19-Mar-03 | 31-May-05 | ||||
| Lewis | Frank | ARRI | Nonlinear Network Structures for Dynamic System Control: REU Supplement | $ 8,000 | National Science Foundation | 47.041 | 16-Jun-03 | 31-May-04 | |||
| Tao | Meng | Electrical Engineering | Semiconductor Surfaces Free of Surface States for Nanoelectronic Applications | $ 180,000 | National Science Foundation | 47.000 | 1-Aug-03 | 31-Jul-05 | |||
| Butler | Donald | Electrical Engineering | Micromachined Infrared Spectrometers | $ 269,736 | National Science Foundation | 47.000 | 1-Sep-03 | 31-Aug-05 | |||
| Jensen-Campbell | Lauri | Psychology | Individual Differences in Self-Regulation during Adolescence | $ 35,720 | National Science Foundation | 47.074 | 1-Sep-03 | 31-Aug-04 | |||
| Cook | Diane | Computer Science Engineering | MavHome: An Intelligent Home Environment - REU Supplement Request | $ 4,500 | National Science Foundation | 47.070 | 7-Apr-02 | 31-Aug-05 | |||
| Lewis | Frank | ARRI | Nonlinear Network Structures for Dynamic System Control: REU Supplement | $ 2,000 | National Science Foundation | 47.041 | 15-Jun-03 | 31-May-04 | |||
| Lewis | Frank | ARRI | Bi-National Effort on Distributed Manufacturing Supervisory Control Systems | $ 9,000 | National Science Foundation | CONACyT Collaborative Rsrch Op | 47.041 | 5-Sep-03 | 31-Jul-05 | ||
| Das | Sajal | Computer Science Engineering | ITR Collaborative Proposal: Pervasively Secure Infrastructures (PSI): Integrating Smart Sensing, Data Mining, Pervasive Networking, and Co | $ 402,500 | National Science Foundation | 47.000 | 15-Sep-03 | 30-Sep-05 | |||
| Reyna | Valerie | Psychology | Processes that Control Children's False-memory Reports: Recollection Rejection and Phantom Recollection | $ 277,234 | National Science Foundation | 47.000 | 6-Dec-03 | 31-Mar-06 | |||
| Butler | Donald | Electrical Engineering | Micromachined Infrared Spectrometers | $ 4,800 | National Science Foundation | 47.000 | 24-Mar-04 | 31-Aug-04 | |||
| Butler | Donald | Electrical Engineering | Micromachined Infrared Spectrometers | $ 1,200 | National Science Foundation | 47.000 | 23-Mar-04 | 31-Aug-04 | |||
| Das | Sajal | Computer Science Engineering | REU Supplement to ITR Proposal | $ 4,800 | National Science Foundation | 47.070 | 15-Sep-03 | 30-Sep-05 | |||
| Das | Sajal | Computer Science Engineering | REU Supplement to ITR Proposal | $ 1,200 | National Science Foundation | 47.070 | 16-Sep-03 | 30-Sep-05 | |||
| Rudkevich | Dmitry | Chemistry | Supramolecular Fixation of Nitrogen Dioxide | $ 94,000 | National Science Foundation | 47.000 | 1-Jun-04 | 31-May-05 | |||
| Scotese | C | Geology | Have Ridge Volumes Changed Over the Past 160Ma? Estimating Impact on Sea Level | $ 159,988 | National Science Foundation | 47.050 | 15-Jul-04 | 31-Aug-06 | |||
| Celik-Butler | Zeynep | Electrical Engineering | Electronic Sensitive Skin with Integrated Tactile, Infrared, Flow Sensors on Flexible Substrates | $ 211,449 | National Science Foundation | 47.070 | 15-Aug-04 | 31-Jul-07 | |||
| Gough | Laura | Biology | Collaborative Research: Above-and Belowground Community Responses to Climate Change in Arctic Tundra | $ 152,149 | National Science Foundation | 47.078 | 15-Aug-04 | 31-Jul-07 | |||
| Fegaras | Leonidas | Computer Science Engineering | XStreamCast: Broadcasting and Query Processing of Streamed XML Data | $ 99,860 | National Science Foundation | 47.000 | 15-Sep-04 | 31-Aug-05 | |||
| Holder | Lawrence | Computer Science Engineering | Acquisition of Instrumentation for Engineering Research in Advanced Security Detection Systems | $ 250,000 | National Science Foundation | 47.070 | 1-Sep-04 | 31-Aug-07 | |||
| Tjuatja | Saibun | Electrical Engineering | Research Experiences for Undegraduates Program | $ 96,813 | National Science Foundation | 47.041 | 1-Jun-03 | 31-May-04 | |||
| Liu | Chaoqun | Mathematics | Numerical Simulation of Laminar-Turbulent Transition in a Compressible Boundary Layer | $ 39,998 | NASA - Langley Research Center | 43.001 | 17-Jun-03 | 31-Mar-04 | |||
| Liu | Chaoqun | Mathematics | Laminar-Turbulent Transition in a Three-dimensional Supersonic Boundary Layer | $ 74,999 | NASA - Langley Research Center | 43.001 | 1-May-03 | 31-Jan-05 | |||
| Huff | Brian | Industrial & Manufacturing Sys. | Simultaneous Fabrication of Smart Aerial Vehicles Feasibility Study | $ 46,850 | NASA - Langley Research Center | 30-Sep-03 | 31-Aug-04 | ||||
| Cuntz | Manfred | Physics | The Coronae of Extremely Inactive (Maunder Minimum?) Stars | $ 9,000 | NASA | 43.001 | 15-Mar-04 | 14-Mar-05 | |||
| Liu | Chaoqun | Mathematics | Laminar Turbulent Transition | $ 50,000 | NASA - Langley Research Center | 16-Jun-04 | 15-Jun-05 | ||||
| Cuntz | Manfred | Physics | Magnetic Activity and FUV Irradiance of Dwarf K Stars: Impact on Exoplanetary Environments | $ 5,000 | NASA | 43.000 | 15-Aug-04 | 14-Aug-05 | |||
| McMahon | Robert | Biology | 100th Meridian Initiative Research in Texas and Analysis of 100th Meridian Initiative Data | $ 16,114 | U.S. Fish and WildLife Service, Region 2 | 15.611 | 1-Aug-02 | 31-Jul-04 | |||
| Holbrook | John | Geology | Testing Preliminary Evidence for High Missouri River Sensitivity to Late Holocene Climate Shifts. | $ 27,997 | U.S. Geological Survey | 15.810 | 1-Jun-04 | 31-May-05 | |||
| Holbrook | John | Geology | Scope of Work for Surficial Geologic Cross Section, Lower Missouri River, Overton Bottoms, Missouri | $ 5,000 | U.S. Geological Survey | 15.810 | 1-Sep-04 | 31-Dec-04 | |||
| Chen | Victoria | Industrial & Manufacturing Sys. | Computational Requirements of Statistical Learning: Ideal Decision-Making for More Sustainable Urban Environments | $ 84,577 | Environmental Protection Agency | 66.500 | 1-Mar-03 | 20-Jun-05 | |||
| Awasthi | Sanjay | Chemistry | Mechanism of Drug Transport in Lung Cancer Cells | $ 491,360 | National Institutes of Health | 93.394 | 1-Mar-03 | 28-Feb-05 | |||
| Tang | Liping | Biomedical Engineering | Foreign Body Reaction and device-centered infection | $ 243,139 | National Institutes of Health | 93.000 | 1-Aug-02 | 31-Jul-04 | |||
| Liu | Hanli | Biomedical Engineering | Hemodynamic Imaging for Brain Tumor Prognosis | $ 284,768 | National Institutes of Health | 93.394 | 1-Jul-03 | 30-Jun-05 | |||
| Bernstein | Ira | Psychology | Development of the Inventory of Depressive Symptomatology | $ 74,000 | National Institute of Mental Health | 93.242 | 3-Jul-03 | 30-Jun-04 | |||
| Fuchs | Perry | Psychology | Supraspinal Processing of Pain Affect | $ 148,000 | National Institutes of Health | 93.390 | 30-Sep-03 | 29-Sep-06 | |||
| Lovely | Carl | Chemistry | Approaches to Bioactive Aminoimidazole Natural Products | $ 210,000 | National Institutes of Health | 93.859 | 1-Jan-04 | 31-Dec-04 | |||
| Reyna | Valerie | Psychology | Interventions for Risk Reduction and Avoidance in Youth. | $ 787,286 | National Institutes of Health | 93.242 | 22-Apr-04 | 30-Apr-05 | |||
| Gatchel | Robert | Psychology | An Evaluation and Treatment Study of TMD | $ 251,600 | National Institute for Global Environmental Change | 93.121 | 1-Jun-04 | 30-Jun-05 | |||
| Gatchel | Robert | Psychology | Early detection and Prevention of Chronic Pain Disability. | $ 30,327 | National Institute of Mental Health | 93.281 | 2-Jul-04 | 31-Aug-04 | |||
| Awasthi | Sanjay | Chemistry | Role of RAIBP1 in Xenobiotic and Radiation Persistance | $ 273,060 | National Institutes of Health | 93.395 | 1-Aug-04 | 31-Jul-05 | |||
| Gatchel | Robert | Psychology | Comorbidity of Mental Disorders and Pain | $ 231,660 | National Institute of Mental Health | 93.281 | 1-Sep-04 | 31-Aug-05 | |||
| Lewis | Frank | ARRI | Visiting Scientist - Manufacturing Engineering Laboratory | $ 46,800 | National Institute of Standards & Technology | 11.611 | 1-Sep-03 | 31-Aug-04 | |||
| Wyman | Sherman | School of Urban/Public Affairs | Proposal to the Economic Development Administration for Contiuation of a University Center | $ 100,000 | Economic Development Administration | 11.303 | 1-Jan-03 | 31-Dec-03 | |||
| Wyman | Sherman | School of Urban/Public Affairs | Proposal to the Economic Development Administration for Contiuation of a University Center | $ 50,000 | Economic Development Administration | 11.303 | 1-Jan-04 | 30-Jun-04 | |||
| Wyman | Sherman | School of Urban/Public Affairs | Research Partner/Crime Analyst Reduction of Gun-related Violence | $ 148,272 | U.S. Department of Justice | 16.609 | 1-Oct-02 | 30-Sep-05 | |||
| Elsenbaumer | Ronald | Office of VP for Research and IT | Nanotech Research Institute | $ 402,367 | Department of Housing & Urban Development | 14.000 | 15-Oct-03 | 14-Oct-08 | |||
| Mann | Martha | Psychology | Alliance for Minority Participation | $ 70,714 | University of Texas at El Paso | AMP | 47.049 | 1-Jan-02 | 31-Oct-04 | ||
| Nelson | Kevin | Biomedical Engineering | Induction of Axon Regeneration by Microfilament Arrays | $ 106,767 | University of Kentucky | 93.371 | 1-Feb-03 | 31-Jan-05 | |||
| Liu | Hanli | Biomedical Engineering | A Near-Infrared Probe for Localization in DBS | $ 84,000 | UTSWMC-Dallas | 93.853 | 1-Sep-02 | 31-Aug-04 | |||
| Zhang | Qiming | Physics | Theoretical Studies of the Physical Properties of Quantum Dots on Semiconductor Substrates | $ 10,000 | UT-Battelle | 81.004 | 1-Dec-02 | 30-Sep-03 | |||
| Chuong | Charles | Biomedical Engineering | Assesment of Corneal Fibroblast Biomechanical Behavior | $ 29,484 | University of Texas Southwestern Medical Center at Dallas | 93.867 | 1-Feb-03 | 31-Jan-04 | |||
| Griego | Manuel | Political Science | Immigrants, Rights and Incorporation in a Suburban Metropolis | $ 79,241 | Southern Methodist University | 47.075 | 1-Jun-01 | 31-May-04 | |||
| De | Kaushik | Physics | Construction of the Intermediate Tile Calorimeter for ATLAS | $ 847,900 | Columbia University | 47.049 | 1-Jun-01 | 31-Jan-05 | |||
| You | S | Mechanical & Aerospace Eng. | Effects of Microporous Coatings on Evaporative Cooling | $ 34,662 | Argonne National Laboratory | 81.087 | 1-Jan-03 | 31-Dec-04 | |||
| Chen | Victoria | Industrial & Manufacturing Sys. | Robust Design Optimization for Product Platform Design | $ 22,840 | Georgia Tech Research Corp | 47.041 | 15-Oct-01 | 31-Jul-05 | |||
| Chippindale | P | Biology | Evolution of virulence in equine infectious anemia virus | $ 54,254 | Texas A & M University | 93.862 | 1-Sep-02 | 31-Aug-04 | |||
| Cuntz | Manfred | Physics | Exploring the Role of Acoustic Heating in Cool Dwarfs and Subgiants | $ 7,592 | NASA | STScI Electronic GMS | 43.001 | 1-Jun-02 | 28-Feb-05 | ||
| Griego | Manuel | Political Science | Immigrants, Rights and Incorporation in a Suburban Metropolis | $ 63,801 | Southern Methodist University | 47.075 | 1-Jun-02 | 31-May-04 | |||
| McMahon | Robert | Biology | Physiological Tolerance and Nonchemical Control Strategies for the Introduced Marine Macrofouling Asian Green Mussel, Perna viridis | $ 26,588 | Texas A & M University | 11.417 | 1-Oct-02 | 30-Sep-03 | |||
| Campbell | Jonathan | Biology | Development of a Distributed Information Network of North American Herpetological Databases | $ 38,628 | University of Kansas | 47.074 | 1-Sep-03 | 31-Aug-05 | |||
| Kirk | Wiley | Electrical Engineering | Multifunction Materials and Applications | $ 102,456 | Texas Engineering Experimental Station (TEES) | NASA flow through | 43.001 | 19-Aug-02 | 18-Aug-07 | ||
| Liu | Chaoqun | Mathematics | 2D Multigrid Solver for Electric Potential | $ 22,499 | Anteon Corporation | 12.800 | 7-Nov-02 | 1-Oct-03 | |||
| Mindel | Charles | School of Social Work | Project Access: Caring for the Uninsured | $ 17,241 | University of Texas Southwestern Medical Center at Dallas | 93.283 | 30-Sep-02 | 29-Sep-03 | |||
| White | Andrew | Physics | QuarkNet 2002 Summer Workshop: Teacher Stipends and Minigrants | $ 5,690 | University of Notre Dame | 47.049 | 10-Jun-02 | 31-Dec-03 | |||
| Mann | Martha | Psychology | Louis Stokes Alliance for Minority Participation (LSAMP) Program | $ 28,750 | University of Texas at El Paso | 47.076 | 1-Nov-02 | 31-Oct-07 | |||
| Reinhartz | Judith | School of Education | UT Arlington Regional Collaborative for Excellence in Science Teaching | $ 24,000 | University of Texas at Austin | 84.276A | 1-Sep-02 | 30-May-04 | |||
| Wilson | Donald | Mechanical & Aerospace Eng. | Experimental Evaluation of Methane Fuel Reformation Feasibility | $ 65,000 | MSE Inc. | 43.002 | 24-Feb-03 | 31-Dec-03 | |||
| Griego | Manuel | Political Science | Immigrants, Rights and Incorporation in a Suburban Metropolis | $ 39,945 | Southern Methodist University | 47.075 | 1-Jun-03 | 31-May-04 | |||
| Rycraft | Joan | School of Social Work | A Field Experimental Analysis of Adoption Awareness Training in Public Health Settings | $ 366,747 | National Council for Adoption | 93.254 | 1-Apr-03 | 30-Sep-04 | |||
| De | Kaushik | Physics | PP2PP Simulation Studies | $ 20,000 | State University of New York | 47.049 | 1-Apr-03 | 31-Mar-04 | |||
| Reinhartz | Judith | School of Education | Promoting Scinece Teaching Excellence Electronically | $ 7,400 | University of Texas at Austin | 84.367 | 1-Sep-02 | 30-Apr-04 | |||
| Brandt | Andrew | Physics | MRI: A Consortium for th eAcquisition of Equiment to Complete a Proton Detector for the Experimental Particle Physics Dzero Detector | $ 90,209 | Northern Illinois University | MRI | 47.000 | 1-Jun-03 | 31-May-04 | ||
| Lee | Wei-Jen | Electrical Engineering | Integrated High Speed Intelligent Utility Tie Unit for Disbursed/Renewable Generation Facilities | $ 30,000 | Intelligent Automation, Inc. | 47.041 | 1-Jul-03 | 30-Dec-03 | |||
| Casani | Drew | ARRI | Texas Manufacturing Assistance Center - Grant Year 8 | $1,660,062 | Texas Engineering Extension Service (TEEX) | 11.611 | 1-Jun-03 | 30-Nov-04 | |||
| Wyman | Sherman | School of Urban/Public Affairs | Pre-proposal Review and Certification for an Incident Report Analysis to Develop Community Intervention Strategies | $ 29,766 | Baylor Helthcare System Foundation | 16.609 | 1-Jul-03 | 30-Jun-05 | |||
| Che | Hao | Computer Science Engineering | Tool Development for Measurement-based, Network Oriented Wireless Channel Modeling | $ 103,190 | University of Texas at Austin | 47.000 | 1-Sep-03 | 31-Aug-04 | |||
| Che | Hao | Computer Science Engineering | Decentralized Traffic Engineering in the Internet: A Sliding Mode Approach | $ 167,137 | Penn State University | 47.000 | 1-Sep-02 | 31-Aug-05 | |||
| Chen | Hua-mei | Computer Science Engineering | ANDRO's Spatial Multi-sensor Autonomous Registration Technologies (A-SMART) | $ 20,000 | ANDRO Computational Solutions, LLC | 23-Oct-03 | 30-Apr-04 | ||||
| Mindel | Charles | School of Social Work | Project Access: Caring for the Uninsured | $ 17,241 | University of Texas Southwestern Medical Center at Dallas | 93.283 | 30-Sep-03 | 29-Sep-04 | |||
| DeLay | Deborah | School of Social Work | Program Evaluation for the "Delayed onset of drug or alcohol use in teens" | $ 2,000 | Lone Star Council, Camp Fire USA | 16.729 | 24-Jan-04 | 31-Dec-04 | |||
| DeLay | Deborah | School of Social Work | Program Evaluation for the "Kids Club Agreement" | $ 2,000 | Lone Star Council, Camp Fire USA | 16.729 | 24-Jan-04 | 31-Dec-04 | |||
| Reinhartz | Judith | School of Education | Bridging to TAKS II: Using Tools to Explore Matter | $ 24,000 | University of Texas at Austin | 84.367 | 15-May-04 | 14-Jul-04 | |||
| Goldsteen | Joel | School of Urban/Public Affairs | Frazier Courts HUD Hope VI - Evaluation Component | $ 89,990 | Dallas Housing Authority | 14.866 | 17-Feb-04 | 17-Feb-05 | |||
| Standlee | Larry | Geology | Field Site Evaluation for Collection of Spatial Data. | $ 3,000 | Texasview Remote Sensing Consortium | 1-Jun-04 | 31-Aug-04 | ||||
| Standlee | Larry | Geology | Comparative Study of Several Generations of Satellite Images of the Dallas Area for Educational Purposes | $ 3,000 | TEXASVIEW | 1-Jul-04 | 31-Aug-04 | ||||
| Subbarao | Kamesh | Mechanical & Aerospace Eng. | Automated Design Optimization for Hypersonic Plasma Aerodynamics | $ 39,975 | HyperComp Inc | 1-Sep-04 | 31-May-05 | ||||
| Subbarao | Kamesh | Mechanical & Aerospace Eng. | Design Challenge | $ 1,250 | Texas Space Grant Consortium | 1-Jan-04 | 31-Aug-04 | ||||
| Scannapieco | Maria | School of Social Work | Protective Services Training Institute Contract | $ 409,512 | University of Texas at Austin | 1-Sep-04 | 31-Aug-05 | ||||
| Chiao | Jung-Chih | Electrical Engineering | SST: Integrated Manufacturing for Millimeterwave Sensing Systems | $ 374,211 | National Science Foundation | 47.041 | 1-Sep-04 | 31-Aug-07 | |||
| Bond | Mary Lou | School of Nursing | Implementation/evaluation of a Support Model for PhD Student Retention | $ 255,612 | Texas Higher Education Coordinating Board | 1-Dec-03 | 31-Aug-05 | ||||
| Anjomani | Ard | School of Urban/Public Affairs | Data Base and Base Map Layers for Tarrant County | $ 3,200 | North Central Texas Council of Governments | 1-Jun-03 | 1-Mar-04 | ||||
| Medley | Paul | Administration | BioGrid Texas (BiGTX) a Virtual Research Park (VRP) for Life Sciences and Health Care. | $ 100,000 | Texas Workforce Commission | 28-May-04 | 30-Nov-05 | ||||
| Puppala | Anand | Civil Engineering | The Effects of Using Compost as a Preventive Measure to Mitigate Shoulder Cracking | $ 98,960 | Texas Department of Transportation | 1-Sep-03 | 31-Aug-04 | ||||
| Li | Jianling | School of Urban/Public Affairs | Projected Changes in Transportation Demand and System Needs | $ 106,216 | Texas Department of Transportation | 1-Sep-03 | 31-Aug-04 | ||||
| Walker | Roger | Computer Science Engineering | Rut/Roughness/PMIS Software/Hardware | $ 50,000 | Texas Department of Transportation | 1-Sep-03 | 31-Aug-04 | ||||
| Li | Jianling | School of Urban/Public Affairs | Developing a Comprehensive Pricing Evaluation Model for Managed Lanes | $ 103,708 | Texas Department of Transportation | 1-Sep-03 | 31-Aug-04 | ||||
| Crosby | Ernest | Civil Engineering | Gutter Flow and Manning "N" Analysis | $ 135,114 | Texas Department of Transportation | 1-Sep-03 | 31-Aug-04 | ||||
| Walker | Roger | Computer Science Engineering | Implementation of the Real-Time Transverse Pavement Profile Measurement System | $ 199,000 | Texas Department of Transportation | 1-Sep-03 | 31-Aug-04 | ||||
| Walker | Roger | Computer Science Engineering | Using Profile Measurements to Locate and Measure Grind and Fill Areas to Improve Pavement Ride | $ 92,444 | Texas Department of Transportation | 1-Sep-03 | 31-Aug-04 | ||||
| Walker | Roger | Computer Science Engineering | Develop a Methodolgy for Collecting Stop and Go Inertial Profile Measurements | $ 41,154 | Texas Department of Transportation | 1-Sep-03 | 31-Aug-04 | ||||
| Abolmaali | Ali | Civil Engineering | Development of Design Criteria for Closed Circuit Television Camera Poles | $ 128,615 | Texas Department of Transportation | 1-Sep-03 | 31-Aug-04 | ||||
| Walker | Roger | Computer Science Engineering | Texture Software Hardware Enhancements | $ 50,000 | Texas Department of Transportation | 1-Sep-03 | 31-Aug-04 | ||||
| Walker | Roger | Computer Science Engineering | Improving Ride Quality of Portland Cement Concrete Pavement (PCCP) | $ 65,000 | Texas Department of Transportation | 1-Sep-03 | 31-Aug-04 | ||||
| Walker | Roger | Computer Science Engineering | Implementation of the Bump Detection Methodology Using Inertial Profile Measurements for the Ride Specification | $ 50,000 | Texas Department of Transportation | 1-Sep-03 | 31-Aug-04 | ||||
| Mattingly | Stephen | Civil Engineering | Technical Assistance Panels | $ 10,500 | Texas Department of Transportation | Technial Assistace Panels | 1-Sep-03 | 31-Aug-04 | |||
| Puppala | Anand | Civil Engineering | Use of Compost to Mitigate Shoulder Cracking | $ 50,000 | Texas Department of Transportation | 18-Feb-04 | 31-Aug-05 | ||||
| Crosby | Ernest | Civil Engineering | Gutter Flow and Manning "N" Analysis | $ 130,000 | Texas Department of Transportation | 1-Sep-04 | 31-Aug-05 | ||||
| Puppala | Anand | Civil Engineering | Deep Mixing Technology for mitigation of Pavement roughness | $ 155,246 | Texas Department of Transportation | 1-Sep-04 | 31-Aug-05 | ||||
| Walker | Roger | Computer Science Engineering | Evaluation of Methods to Measure Ride (Profile) and Cross Slope on New Base Course and Pavements | $ 40,005 | Texas Department of Transportation | 1-Sep-04 | 31-Aug-05 | ||||
| Williams | James | Civil Engineering | Development of guidelines for Ramp Reversal Projects, Project 0-5105 | $ 36,249 | Texas Department of Transportation | 1-Sep-04 | 31-Aug-05 | ||||
| Walker | Roger | Computer Science Engineering | Implementation of the Bump Detection Methodology Using Inertial Profile Measurements for the Ride Specification | $ 50,000 | Texas Department of Transportation | 1-Sep-04 | 31-Aug-05 | ||||
| Walker | Roger | Computer Science Engineering | Using Profile Measurements to Locate and Measure Grind and Fill Areas to Improve Pavement Ride | $ 92,482 | Texas Department of Transportation | 1-Sep-04 | 31-Aug-05 | ||||
| Puppala | Anand | Civil Engineering | Use of Compost to Mitigate Shoulder Cracking | $ 35,000 | Texas Department of Transportation | 1-Sep-04 | 31-Aug-05 | ||||
| Abolmaali | Ali | Civil Engineering | Development of Design Criteria for Closed Circuit Television Camera Poles | $ 17,589 | Texas Department of Transportation | 1-Sep-04 | 31-Aug-05 | ||||
| Mattingly | Stephen | Civil Engineering | Technical Assistance Panels | $ 10,500 | Texas Department of Transportation | Technial Assistace Panels | 1-Sep-04 | 31-Aug-05 | |||
| Grover | James | Biology | Algal Succession in the Trinity River: Identification and enumeration of major populations | $ 9,670 | Trinity River Authority | 12-Mar-02 | 31-Jan-04 | ||||
| Kondraske | George | Electrical Engineering | Human Performance Capacity Profiles & Their Relationship to Laparoscopic Surgical Performance | $ 23,766 | University of Texas Southwestern Medical Center at Dallas | 1-Jan-03 | 31-Dec-03 | ||||
| Kamangar | Farhad | Computer Science Engineering | Connect - A Personal Remote Messaging and Monitoring Infrastructure to Serve Persons with Disabilities | $2,112,533 | Health & Human Services Commission | 1-Sep-03 | 30-Aug-05 | ||||
| Grover | James | Biology | Consultation on special studies, basin summary report, and other matters | $ 14,687 | Trinity River Authority | 28-Apr-04 | 31-Aug-05 | ||||
| Grover | James | Biology | Developing a Predictive Understanding of Prymnesium Parvum (P.parvum) Toxic Bloom Formation and Its Control | $ 83,386 | Texas Parks and Wildlife Department. | 1-Jul-04 | 31-Dec-05 | ||||
| Repko | Allen | Academic Affairs | UTA/Community College Transfer Consortium; Texas TWO-STEP Project | $ 184,000 | Weatherford College | 1-Sep-04 | 31-Aug-05 | ||||
| Bohannan | Randy | ARRI | ISO 9001 Conversion and Implementation | $ 7,800 | Atlan Industries | 15-Oct-02 | 30-Sep-03 | ||||
| Bohannan | Randy | ARRI | ISO 9001: 2000 Conversion and Implementation | $ 5,850 | Cable Technologies, Inc | 1-Apr-03 | 30-Sep-03 | ||||
| Casani | Drew | ARRI | ISO 9001 Internal Audits | $ 1,800 | Dytech Solutions International | TMAC | 1-Apr-03 | 31-Jan-04 | |||
| Casani | Drew | ARRI | HAZWOPER Support | $ 1,125 | Ferro Corporation | TMAC | 20-Dec-02 | 20-Dec-03 | |||
| Johnson | Mary | ARRI | Work Measurement for APC Cell Phones | $ 40,000 | Motorola | 15-Jan-03 | 31-Dec-03 | ||||
| Casani | Drew | ARRI | QMS Improvement Implementation | $ 1,800 | Precision Technology, Inc. | TMAC | 1-Apr-03 | 31-Jan-04 | |||
| Johnson | Dave | ARRI | Quality Management System | $ 16,000 | Texas Equipment & Service Company | 1-May-03 | 30-Nov-03 | ||||
| Hernandez | Ruben | ARRI | QMS, EMS, Strategic Planning and Process Improvements | $ 24,000 | Texas Nameplate Company | 26-Mar-03 | 1-Mar-04 | ||||
| Bohannan | Randy | ARRI | ISO 9001: 2000 Conversion | $ 5,550 | Williams-Pyro, Inc. | 1-Feb-03 | 30-Sep-03 | ||||
| Casani | Drew | ARRI | Strategic Planning Implementation | $ 4,500 | Williams-Pyro, Inc. | TMAC | 28-Feb-03 | 31-Dec-04 | |||
| Casani | Drew | ARRI | Workplace Organization/ Layout | $ 15,125 | Abscoa, Inc | TMAC | 14-Apr-04 | 31-Jul-04 | |||
| Middelkoop | Kurt | ARRI | EMS Design and Implementation | $ 13,090 | ACTIS Manufacturing Ltd. | 16-Feb-04 | 30-Sep-04 | ||||
| Johnson | Dave | ARRI | QMS Design and Implementation | $ 21,500 | Aero Fabricators | 1-Oct-03 | 31-May-04 | ||||
| Stockstill | William | ARRI | Process Design and Improvement | $ 53,800 | Aero Fabricators | 1-Apr-03 | 31-Dec-03 | ||||
| Johnson | Dave | ARRI | QMS Process Improvement | $ 7,500 | Airco Industries | 25-Aug-03 | 31-Mar-04 | ||||
| Johnson | Dave | ARRI | Quality Management System Improvements | $ 12,650 | Airco Industries | 15-Jun-02 | 30-Nov-03 | ||||
| Sessumes | Mark | ARRI | Lean Design and Implementation | $ 26,000 | Alcon Laboratories | 3-Nov-03 | 31-Dec-04 | ||||
| Stockstill | William | ARRI | Workplace Design and Layout | $ 9,650 | Alliance Systems, Inc. | 5-Jul-04 | 1-Oct-04 | ||||
| Casani | Drew | ARRI | QMS Improvement Implementation | $ 1,800 | Arrow Fabricated Tubing | TMAC | 1-May-03 | 28-Feb-04 | |||
| Groenteman | Frank | ARRI | Lean Office with Simulation | $ 7,000 | Celanese Chemicals | 18-Aug-04 | 31-Aug-04 | ||||
| Sessumes | Mark | ARRI | Lean Design and Pilot Implementation | $ 9,200 | Central Industrial Supply Company | 1-Dec-03 | 31-Mar-04 | ||||
| Casani | Drew | ARRI | Alignement of Standards/Router Steps | $ 3,663 | CFO Advisory Services, LP | TMAC | 2-Feb-04 | 31-Mar-04 | |||
| Casani | Drew | ARRI | ERP Implementation Management | $ 14,400 | CFO Advisory Services, LP | TMAC | 1-Feb-04 | 30-Jun-04 | |||
| Casani | Drew | ARRI | ERP System Definition III | $ 1,600 | CFO Advisory Services, LP | TMAC | 16-Oct-03 | 31-Oct-03 | |||
| Casani | Drew | ARRI | Requirements Definition ans Software Selection | $ 4,800 | CFO Advisory Services, LP | TMAC | 15-Jun-03 | 30-Oct-03 | |||
| Casani | Drew | ARRI | Routher Data Development | $ 3,000 | CFO Advisory Services, LP | TMAC | 1-Mar-04 | 30-Apr-04 | |||
| Casani | Drew | ARRI | Lean 101 for Management | $ 2,500 | CIS | TMAC | 3-Sep-03 | 30-Oct-03 | |||
| Casani | Drew | ARRI | Screening Area Design | $ 2,390 | Classic Cads and Embroidery | TMAC | 1-Aug-03 | 30-Oct-03 | |||
| Hernandez | Ruben | ARRI | ISO 9001:2000 Quarterly Review of QMS | $ 1,800 | Clay Precision | 1-May-03 | 30-Apr-04 | ||||
| Bohannan | Randy | ARRI | Strategic Planning | $ 7,700 | Conner Industries, Inc. | TMAC | 1-Jun-03 | 30-Sep-03 | |||
| Casani | Drew | ARRI | Strategic Plan Implementation | $ 4,000 | Conner Industries, Inc. | TMAC | 15-Nov-03 | 31-Oct-04 | |||
| Casani | Drew | ARRI | Cellular Flow Pilot Project | $ 3,000 | D/I Laser Products of Dallas | TMAC | 27-Oct-03 | 14-Nov-03 | |||
| Casani | Drew | ARRI | Partnership Agreement | $ 100,000 | Dallas County Community College | 24-Sep-03 | 31-Aug-04 | ||||
| Casani | Drew | ARRI | ERP and Process Improvement | $ 2,100 | DIAB, Inc. | TMAC | 12-Apr-04 | 31-May-04 | |||
| Crosswell | Joe | ARRI | ERP System Implementation | $ 95,363 | DIAB, Inc. | 1-Feb-04 | 31-Aug-04 | ||||
| Groenteman | Frank | ARRI | Cost and Lead Time Reduction Study, Phase 2 | $ 3,300 | DIAB, Inc. | TMAC | 1-Jun-03 | 30-Sep-03 | |||
| Casani | Drew | ARRI | Quality Management System Sustaining | $ 3,600 | Dosmatic USA | TMAC | 10-Jan-03 | 31-Dec-03 | |||
| Casani | Drew | ARRI | QMS Research and Implementation | $ 3,000 | Esquire Tooling and Manufacturing | TMAC | 1-Mar-03 | 31-Jan-04 | |||
| Casani | Drew | ARRI | As 9000 Rev B Process Support | $ 3,700 | Essner Manufacturing, Inc. | TMAC | 10-Apr-04 | 30-Apr-04 | |||
| Johnson | Dave | ARRI | QMS Design and Implementation | $ 9,200 | Essner Manufacturing, Inc. | 15-Dec-03 | 30-Jun-04 | ||||
| Casani | Drew | ARRI | Manufacturing Improvements, Phase III | $ 12,500 | Garrett Metal Detectors | TMAC | 1-Apr-04 | 31-Oct-04 | |||
| Middelkoop | Kurt | ARRI | Manufacturing Improvements, Phase 2. | $ 11,600 | Garrett Metal Detectors | 10-Oct-03 | 31-Jan-04 | ||||
| Bohannan | Randy | ARRI | Strategic Planning Process Installation | $ 8,500 | Granitite of North Texas | 8-Oct-03 | 31-Jan-04 | ||||
| Casani | Drew | ARRI | Facility Design and Layout | $ 2,925 | Hatco, Inc. | TMAC | 14-Nov-03 | 15-Jan-04 | |||
| Sessumes | Mark | ARRI | Lean Layout (DEXAS) | $ 5,000 | Hogan and Associates | TMAC | 15-Jun-03 | 30-Oct-03 | |||
| Johnson | Dave | ARRI | QMS Design and Implementation | $ 17,500 | Inovar Packaging Group, Inc. | 1-Jan-04 | 30-Sep-04 | ||||
| Casani | Drew | ARRI | QMS Design and Implementation | $ 8,700 | IPS | TMAC | 16-Feb-04 | 31-Aug-04 | |||
| Casani | Drew | ARRI | Green Belt Projects Phase II | $ 5,000 | Johnson and Johnson | TMAC | 1-Aug-03 | 30-Oct-03 | |||
| Groenteman | Frank | ARRI | Project Management | $ 11,200 | Johnson and Johnson | TMAC | 1-Sep-03 | 31-Dec-03 | |||
| Casani | Drew | ARRI | ISO 9001 Process Improvement | $ 3,000 | Knox Machine Company | TMAC | 17-Sep-03 | 17-Sep-04 | |||
| Casani | Drew | ARRI | Sales Performance Improvement | $ 19,800 | Lubrication Engineers | TMAC | 16-Feb-04 | 30-Apr-04 | |||
| Woodard | Marge | ARRI | Research & Design of Marketing Plan | $ 29,256 | Lubrication Engineers | 17-Nov-03 | 30-Apr-04 | ||||
| Sessumes | Mark | ARRI | Lean Implementation II - Paint Shop Labels | $ 10,000 | Luminator | 1-Nov-03 | 31-Mar-04 | ||||
| Casani | Drew | ARRI | 5sDesign and Implementation | $ 3,500 | Morrison Products, Inc | TMAC | 11-Nov-03 | 15-Nov-03 | |||
| Casani | Drew | ARRI | Layout Expansion | $ 1,300 | Moulding Associates Inc. | TMAC | 17-Oct-03 | 1-Dec-03 | |||
| Hernandez | Ruben | ARRI | AS9100 Design and Implementation | $ 16,000 | National Utilities Company | 27-Sep-04 | 30-Apr-05 | ||||
| Johnson | Dave | ARRI | EMS Design and Implementation | $ 20,000 | Pilgrim's Pride Corporation | 11-Jan-04 | 31-Jul-04 | ||||
| Bohannan | Randy | ARRI | Strategic Planning | $ 8,000 | Printing Research, Inc. | 1-Jun-03 | 30-Sep-03 | ||||
| Casani | Drew | ARRI | ISO 9000 Process Support | $ 3,600 | Santech Industries | TMAC | 2-Sep-03 | 2-Sep-04 | |||
| Casani | Drew | ARRI | Warehouse Pick and Ticket Kaizen | $ 2,000 | Santech Industries | TMAC | 3-Nov-03 | 31-Dec-03 | |||
| Johnson | Dave | ARRI | ISO 9001: 2000 Implementation | $ 7,650 | Semiconductor Equipment Services Corporation | TMAC | 19-May-02 | 30-Dec-03 | |||
| Middelkoop | Kurt | ARRI | Methods Analysis | $ 10,000 | Solectron | 1-Jul-03 | 31-Oct-03 | ||||
| Casani | Drew | ARRI | New Building Feasibility Study | $ 3,700 | Spiral Pipe of Texas, Inc. | TMAC | 7-Jan-04 | 31-Mar-04 | |||
| Sessumes | Mark | ARRI | Cellular Pilot | $ 7,500 | T. R. Hoover Community Development Corporation | TMAC | 10-Dec-03 | 31-Jan-04 | |||
| Johnson | Dave | ARRI | QMS Design and Implementation | $ 7,200 | Texas Aircraft Milling, Inc. | 15-Sep-03 | 30-Jun-04 | ||||
| Hernandez | Ruben | ARRI | Management Systems Maintenance/Training and Process Improvements | $ 24,000 | Texas Nameplate Company | 30-Jun-04 | 30-Jun-05 | ||||
| Casani | Drew | ARRI | New Production Layout | $ 4,750 | TEXSAR | TMAC | 2-Feb-04 | 30-Apr-04 | |||
| Beard | Tom | ARRI | Mechanical Test-Design and Conduct | $ 5,500 | The Dannon Company | 1-Jul-03 | 1-Jul-04 | ||||
| Johnson | Dave | ARRI | TS 16949 / ISO 14000 | $ 24,000 | Tripac International | 1-Sep-03 | 31-Jul-04 | ||||
| Johnson | Dave | ARRI | QMS Design and Implementation | $ 8,500 | Universal Machining Industries, Inc. | 1-Oct-03 | 31-May-04 | ||||
| Casani | Drew | ARRI | Bar Code Shipping Labels | $ 3,635 | Valere Power | TMAC | 20-Oct-03 | 20-Nov-03 | |||
| Casani | Drew | ARRI | Information Systems Analysis and Planning | $ 3,450 | Valere Power | TMAC | 1-Feb-04 | 30-Mar-04 | |||
| Beardsley | Heather | ARRI | Development of Robot-based Routing Cell for Aircraft Food Trays | $ 92,490 | Weber Aircraft | 1-Sep-03 | 27-Feb-04 | ||||
| Aikman | Russ | ARRI | Lean Six Sigma Executive Overview. | $ 6,500 | David Weekley Homes | 30-Jul-04 | 30-Sep-04 | ||||
| Casani | Drew | ARRI | 5 S/Cellular Rapin Improvement Event Round Dept | $ 7,500 | T D Industries | TMAC | 23-Feb-04 | 27-Mar-04 | |||
| Rudkevich | Dmitry | Chemistry | Molecular Compartments: An Approach towards Multiple Guest Selection through Encapsulation | $ 39,500 | Petroleum Research fund | 1-Sep-03 | 31-Aug-04 | ||||
| Rudkevich | Dmitry | Chemistry | Molecular Compartments: An Approach towards Multiple Guest Selection through Encapsulation | $ 500 | Petroleum Research fund | 2-Sep-03 | 31-Aug-04 | ||||
| Passy | Sophia | Biology | Algal Communities as Indicators of Streambed Instability and Restoration | $ 255,747 | New York State Dept of Environmental Conservation | 1-Sep-01 | 31-Dec-05 | ||||
| Kirk | Wiley | Electrical Engineering | Preparation of Zinc Sulfide/Silicon Heterostructures with Aluminum Backside Coating | $ 48,000 | State University of New York | 1-Jan-02 | 20-Mar-05 | ||||
| Behbehani | Khosrow | Biomedical Engineering | Detection of Sleep Disordered Breathing in Congestive Heart Failure Patients Using Extended ECG | $ 61,984 | American Heart Association | 1-Jul-02 | 31-Mar-04 | ||||
| Tang | Liping | Biomedical Engineering | Molecular mechanisms of biomaterial-mediated fibrotic responses | $ 75,000 | American Heart Association | National Center Research | 1-Jul-03 | 30-Jun-04 | |||
| Tang | Liping | Biomedical Engineering | Molecular mechanisms of biomaterial-mediated fibrotic responses | $ 75,000 | American Heart Association | National Center Research | 1-Jul-04 | 30-Jun-05 | |||
| Tao | Meng | Electrical Engineering | Understanding Intra-Bond Absorption in Semiconductors for Photovoltaics | $ 39,500 | Petroleum Research fund | 1-Jul-03 | 31-Aug-05 | ||||
| Smith | Pete | Ctr. For Distance Education | Synthesis of Distance Education Literature | $ 11,480 | Texas Distance Learning Association | 1-Sep-03 | 31-Aug-04 | ||||
| Fuchs | Perry | Psychology | Behavioral Measurement of Nociception in Experimental Autoimmune Encephalomyelitis | $ 33,000 | National Multiple Sclerosis Society | 1-Sep-02 | 30-Nov-03 | ||||
| Lee | Wei-Jen | Electrical Engineering | Proposal to Conduct and Study and Develop a Strategic Plan for an Energy Center at Alcorn State University | $ 99,800 | Alcorn State University | 17-Feb-03 | 31-Jan-04 | ||||
| Judkins | Sharon | School of Nursing | Hardiness Training Among Nurse Managers: A Longitudinal Study | $ 1,035 | Sigma Theta Tau International | 14-Apr-03 | 14-Apr-04 | ||||
| Anderson | Cheryl | School of Nursing | Pregnancy Related Depression Among Teens: Ethnic and Racial Disparity | $ 966 | Sigma Theta Tau International | 14-Apr-03 | 14-Apr-04 | ||||
| Snow | Diane | School of Nursing | Anxiety and Substance Use Disorders in Patients with Bipolar Disorders | $ 966 | Sigma Theta Tau International | 14-Apr-03 | 14-Apr-04 | ||||
| Mattingly | Stephen | Civil Engineering | Institutional Approaches for Interjurisdictional System Management | $ 48,733 | University of California Berkeley | 10-Oct-02 | 30-Jun-04 | ||||
| Anderson | Cheryl | School of Nursing | Workplace Violence: Reducing the rate in a Community Hospital | $ 990 | Sigma Theta Tau International | 1-May-03 | 30-Apr-04 | ||||
| MacDonnell | Frederick | Chemistry | New Photocatalysts Capable of Driving Multi-electron Redox Reactions | $ 79,000 | American Chemical Society | PRF Type AC | 1-Jul-03 | 31-Aug-05 | |||
| Passy | Sophia | Biology | Assessment of Stream Chemistry and Benthic Diatom and Macroinvertebrate Communities in the Oswegatchie-Black River Basins | $ 74,977 | New York State Energy Research & Development Authority | 1-Mar-03 | 31-Mar-06 | ||||
| Anderson | Cheryl | School of Nursing | Workplace Violence: Reducing the Rate in a Community Hospital | $ 2,000 | Southern Nursing Research Society | 1-Jun-03 | 31-May-04 | ||||
| Mellgren | Roger | Psychology | Dog and Human Personality and Successful Shelter Adoptions | $ 33,596 | Petsmart Foundation | 18-Dec-03 | 17-Dec-04 | ||||
| Kardong | Susan | School of Nursing | Cultural Competency of Nursing and Health Education Faculty | $ 1,225 | Sigma Theta Tau International | 14-May-04 | 15-May-05 | ||||
| Poster | Elizabeth | School of Nursing | Promise of Nursing Dallas/Fort Worth Nursing School Grant | $ 19,954 | Foundation of the National Student Nurses' Association, Inc. | 1-Aug-04 | 31-Dec-05 | ||||
| Benson | George | Management | Course Release Grant | $ 21,982 | Center for Effective Organizations | 1-Sep-04 | 31-Dec-04 | ||||
| Dias | Rasika | Chemistry | Fluorinated Poly(pyrazolyl) borates | $ 50,000 | Welch Foundation | 1-Jun-03 | 31-May-04 | ||||
| Dias | Rasika | Chemistry | Fluorinated Poly(pyrazolyl) borates | $ 70,000 | Welch Foundation | 1-Jun-04 | 31-May-05 | ||||
| Elsenbaumer | Ronald | Chemistry | Designed Intermolecular Orbital Overlap in Supramolecular Architecture Derived from Linear Conjugated Molecules Self-Assembled by Metal Ion | $ 50,000 | Welch Foundation | 1-Jun-03 | 31-May-04 | ||||
| Elsenbaumer | Ronald | Chemistry | Designed Intermolecular Orbital Overlap in Supramolecular Architectures Derived from Linear Conjugated Molecules Self-assembled by Metal Ion Complexation | $ 8,500 | Welch Foundation | 1-Jun-04 | 31-Jul-04 | ||||
| MacDonnell | Frederick | Chemistry | Exploring Metal-Based Chirality as a Tool for the Construction of Supramolecular Systems | $ 50,000 | Welch Foundation | 1-Jun-03 | 31-May-04 | ||||
| MacDonnell | Frederick | Chemistry | Hierarchical Assembly of Configurationally Rigid Dendrimers into Mesoscale Structures | $ 50,000 | Welch Foundation | 1-Jun-04 | 31-May-05 | ||||
| McDowell | Keith | Chemistry | Molecular-Level Conductivity: Stochastic Electron Transfer | $ 50,000 | Welch Foundation | 1-Jun-03 | 31-May-04 | ||||
| Schelly | Zoltan | Chemistry | Relaxation Kinetics of Organized Assemblies | $ 50,000 | Welch Foundation | 1-Jun-03 | 31-May-04 | ||||
| Schelly | Zoltan | Chemistry | Relaxation Kinetics of Organized Assemblies | $ 50,000 | Welch Foundation | 1-Jun-04 | 31-May-05 | ||||
| Fry | John | Physics | Theoretical Studies of the Condensed State of Matter | $ 50,000 | Welch Foundation | 1-Jun-03 | 31-May-04 | ||||
| Fry | John | Physics | Theoretical Studies of the Condensed State of Matter | $ 50,000 | Welch Foundation | 1-Jun-04 | 31-May-05 | ||||
| Weiss | Alex | Physics | Positron Annihilation induced Auger Electron Spectroscopy - A New Method for the Chemical Analysis of Surfaces | $ 50,000 | Welch Foundation | 1-Jun-03 | 31-May-04 | ||||
| Weiss | Alex | Physics | Positron Annihilation induced Auger Electron Spectroscopy - A New Method for the Chemical Analysis of Surfaces | $ 50,000 | Welch Foundation | 1-Jun-04 | 31-May-05 | ||||
| Rogers | Jimmy | Chemistry | Welch Summer Scholar Program | $ 35,663 | Welch Foundation | 1-Jun-02 | 31-May-05 | ||||
| Marynick | Dennis | Chemistry | The Application of Density Functional Theory to Fundamental Issues in Biomolecular and Inorganic Systems | $ 60,000 | Welch Foundation | 1-Jun-03 | 31-May-04 | ||||
| Marynick | Dennis | Chemistry | The Application of Density Functional Theory to Fundamental Issues in Biomolecular and Inorganic Systems | $ 70,000 | Welch Foundation | 1-Jun-04 | 31-May-05 | ||||
| Koymen | Ali | Physics | Exchange Bias in Rare Earth-transition Metal Nanolayers | $ 50,000 | Welch Foundation | 1-Jun-03 | 31-May-04 | ||||
| Koymen | Ali | Physics | Exchange Bias in Rare Earth-transition Metal Nanolayers | $ 50,000 | Welch Foundation | 1-Jun-04 | 31-May-05 | ||||
| Lovely | Carl | Chemistry | Synthetic Approaches to Marine Alkaloids | $ 50,000 | Welch Foundation | 1-Jun-03 | 31-May-04 | ||||
| Lovely | Carl | Chemistry | Synthetic Approaches to Marine Alkaloids | $ 50,000 | Welch Foundation | 1-Jun-04 | 31-May-05 | ||||
| Pomerantz | Martin | Chemistry | Studies of Bithiophenes | $ 50,000 | Welch Foundation | 1-Jun-03 | 31-May-04 | ||||
| Pomerantz | Martin | Chemistry | Studies of Bithiophenes | $ 50,000 | Welch Foundation | 1-Jun-04 | 31-May-05 | ||||
| Ray | Asok | Physics | A Density Functional Study of the Surface Electronic Behavior of Actinide Metals | $ 50,000 | Welch Foundation | 1-Jun-03 | 31-May-04 | ||||
| Ray | Asok | Physics | A Density Functional Study of the Surface Electronic Behavior of Actinide Metals | $ 50,000 | Welch Foundation | 1-Jun-04 | 31-May-05 | ||||
| DeLay | Deborah | School of Social Work | Evaluation Plan of Margaret Cone and Herry Junkins Head Start Centers | $ 165,515 | Texas Instruments Foundation | 1-Jan-03 | 31-Dec-04 | ||||
| Chuong | Charles | Biomedical Engineering | Computer Modeling of Oral and Cranio-Maxillofacial Surgical Procedures and Fixation Techniques | $ 51,000 | Oral and Maxillofacial Surgery Foundation | 1-Mar-02 | 28-Feb-05 | ||||
| Raudonis | Barbara | School of Nursing | Using Prognostic Indices in Palliative Care | $ 9,567 | American Nurses Foundation, Inc. | 1-Oct-02 | 1-Apr-04 | ||||
| Dulikravich | George | Mechanical & Aerospace Eng. | A Helical Turbine System for Wind and Hydraulic Energy Recovery | $ 5,000 | U.S. Civilian Research and Development Foundation | 1-Apr-03 | 31-Mar-05 | ||||
| Lu | Frank | Mechanical & Aerospace Eng. | Protecting Buildings from Terrorist-type Explosions with Fail-safe Constrution Techniques | $ 18,000 | U.S. Civilian Research and Development Foundation | 1-Apr-03 | 31-Jul-04 | ||||
| Rudkevich | Dmitry | Chemistry | Sloan Research Fellowship | $ 40,000 | Sloan (Alfred P.) Foundation | 16-Sep-03 | 15-Sep-05 | ||||
| Francaviglia | Richard | History | Touchstones to History: Using Historic Resources in Internet/Video Based Educational Outreach | $ 65,750 | Houston Endowment, Inc. | 1-Sep-03 | 31-Aug-05 | ||||
| Francaviglia | Richard | History | Improving the Teaching of Texas History | $ 25,000 | Summerlee Foundation | 1-Sep-03 | 31-Dec-04 | ||||
| DeLay | Deborah | School of Social Work | Homeless Collaboration Project | $ 5,000 | Salvation Army | 1-Jun-04 | 31-Aug-05 | ||||
| Green | George | History | The Labor Movement in Texas, 1870s - 1920s | $ 3,355 | Summerlee Foundation | 1-Jul-04 | 1-Aug-05 | ||||
| Shiakolas | P. | Mechanical & Aerospace Eng. | Analysis Evaluation and Performance Improvement of Wire Harness Robotic Assy Cell | $ 24,900 | Bell Helicopter Textron | 16-Jun-02 | 31-Oct-03 | ||||
| Kim | Choong | Materials Science & Eng. | Mechanism of Thermal Fatigue in Cu Interconnects | $ 50,000 | Semiconductor Research Corporation | 1-Jun-03 | 31-May-04 | ||||
| Kim | Choong | Materials Science & Eng. | Thermochemical and Mechanical Properties of Ag-Cu Sn Lead Free Solder Alloys with the Addition of Minor | $ 124,133 | Nokia Mobile Phone | 1-Dec-02 | 30-Nov-03 | ||||
| McMahon | Robert | Biology | The Nature of Thermal Tolerance in the Western Mosquito Fish, Gambusia affinis, Exposed to Heated Effluents | $ 65,174 | TXU Electric and Gas | 1-Jan-03 | 31-Dec-04 | ||||
| Damuth | John | Geology | Sea Level Control of Late Quaternary Depositional Processes in Northern Gulf of Mexico Intraslope Basins | $ 216,000 | Joint Industry | 1-Feb-02 | 31-Jan-05 | ||||
| Agonafer | Dereje | Mechanical & Aerospace Eng. | The Impact of Board Layout and Layup on PWB Warpage during Fabrication and due to Reflow and Wave Soldering Process | $ 76,000 | Sun Microsystems Inc. | 1-Apr-02 | 31-Aug-04 | ||||
| Timmons | Richard | Chemistry | Pulsed Plasma Processing for Surface Functionalization | $ 50,000 | Agilent Technologies | External Research Program | 1-Sep-03 | 31-Aug-04 | |||
| Celik-Butler | Zeynep | Electrical Engineering | Measurements and Modeling of Noise in Advanced Bipolar Technologies | $ 105,342 | Semiconductor Research Corporation | 1-Sep-03 | 31-Dec-04 | ||||
| Agonafer | Dereje | Mechanical & Aerospace Eng. | Application of Masterflux Compressor in Modular Refrigeration Unit | $ 50,000 | Tabor Transportation Company, Inc. | 1-Sep-02 | 31-Dec-03 | ||||
| Chan | Wen | Mechanical & Aerospace Eng. | Evaluatioin of Mechanical and Thermal Properties of Braid Composite Laminates | $ 75,000 | Bell Helicopter Textron | 15-Oct-02 | 6-Dec-03 | ||||
| Reyes | Arthur | Computer Science Engineering | A Proposal to Establish UTA Expertise in Developing HLA-Compatible Simulation Products | $ 7,336 | Lockheed Martin Corporation | 15-Jan-03 | 31-Dec-03 | ||||
| Kondraske | George | Electrical Engineering | Investigation of Relationships Between Musician Performance Capacities, Playing Style, and Performance Related Injuries | $ 22,500 | The Recording Academy | 1-May-03 | 30-Apr-05 | ||||
| Fuchs | Perry | Psychology | Pharmacological Modulation of Diabetic Neuropathy | $ 53,200 | Neurodetective, Inc. | 15-May-03 | 31-Dec-03 | ||||
| Bassler | John | Marketing | Aesthetic Product Evaluations | $ 10,309 | Mary Kay, Inc. | 27-May-03 | 2-Sep-03 | ||||
| Behbehani | Khosrow | Biomedical Engineering | Endovasc JV1 Coronary Artery Stent Development | $ 14,126 | TissueGen, Inc. | 1-Sep-03 | 31-Aug-04 | ||||
| Behbehani | Khosrow | Biomedical Engineering | Wavelet Analysis of Neural Signals | $ 23,541 | Presbyterian Hospital of Dallas | 1-Jun-03 | 31-Dec-04 | ||||
| Behbehani | Khosrow | Biomedical Engineering | Shortness of Breath During Exertion in Obesity: Cardiovascular Deconditioning or Respiratory Limitation | $ 23,541 | Presbyterian Hospital of Dallas | 1-Jun-03 | 31-Dec-04 | ||||
| Timmons | Richard | Chemistry | Surface Modification of Fine Powders | $ 40,000 | E.I. Dupont De Nemours and Co. | 2-Sep-03 | 31-Aug-04 | ||||
| Anjomani | Ard | School of Urban/Public Affairs | Bexar Street Retail Development Plan | $ 17,572 | T. R. Hoover Community Development Corporation | 24-Sep-03 | 31-Dec-04 | ||||
| DeLay | Deborah | School of Social Work | Program Evaluation Plan for Youth Mentor Network of Plano | $ 2,000 | Youth Mentor Network of Plano | 1-Dec-03 | 31-Aug-04 | ||||
| Tang | Liping | Biomedical Engineering | In vivo Evaluation of Drug Delivery Formulation - Controlled Drug Delivery in Rabbit Eyes | $ 127,000 | Alcon Laboratories | 20-Nov-03 | 19-Nov-05 | ||||
| Behbehani | Khosrow | Biomedical Engineering | TissueGen Student Research | $ 4,950 | TissueGen, Inc. | 15-Jan-04 | 31-May-04 | ||||
| Abolmaali | Ali | Civil Engineering | Water Damage Evaluation of Infrastructure Concrete with and without Chem-crete Pavix (TM). | $ 24,800 | Chem-Crete International | 15-Jan-04 | 30-Jun-05 | ||||
| Behbehani | Khosrow | Biomedical Engineering | TissueGen Student Research | $ 450 | TissueGen, Inc. | 11-Feb-04 | 31-Aug-08 | ||||
| Lee | Wei-Jen | Electrical Engineering | Dynamic Performance Monitoring System Upgrade for Formosa Plastic Co. | $ 70,370 | Formosa Plastics, Inc. | 2-Jan-04 | 1-Jan-05 | ||||
| Rosenberger | Jay | Industrial & Manufacturing Sys. | Evaluating Resource Allocation | $ 25,887 | Lockheed Martin Corporation | 2-Mar-04 | 20-Dec-04 | ||||
| Celik-Butler | Zeynep | Electrical Engineering | Noise Modeling at Quantum Level for Advanced CMOS Technologies. | $ 60,000 | Semiconductor Research Corporation | 1-Apr-04 | 31-Mar-05 | ||||
| Kim | Choong | Materials Science & Eng. | Investigation of Stability of the Diffusion Barrier and its Impact on Low-K/Cu Integration Reliability | $ 50,000 | Semiconductor Research Corporation | 1-May-04 | 30-Apr-07 | ||||
| Kondraske | George | Electrical Engineering | Effect of Spark and POS3 on Selected Performance Capacity Measurements | $ 36,095 | AdvoCare International | 1-Mar-04 | 31-Aug-04 | ||||
| Wang | Bo Ping | Mechanical & Aerospace Eng. | Reliability-based Design Optimization for Electronic Packages | $ 139,104 | Nokia Mobile Phone | 2-Jan-04 | 31-Dec-04 | ||||
| Ahmad | Ishfaq | Computer Science Engineering | Development of the AVS Video Codec | $ 200,000 | Sun Microsystems Inc. | 1-Feb-04 | 31-Jan-06 | ||||
| Shan | Hua | Mathematics | Numerucal Simulation of Flow control with Dynamic Vortex Generator. | $ 30,000 | Lockheed Martin Corporation | 14-Jun-04 | 3-Dec-04 | ||||
| Kim | Choong | Materials Science & Eng. | Characterization of Electromigration Properties of Agere Systems AFR5Metallization Structures | $ 89,614 | Agere Systems | 1-Jun-04 | 30-Jan-05 | ||||
| Nelson | Kevin | Biomedical Engineering | Mass Transfer Virus Purification | $ 7,454 | Aethlon Medical | 7-Sep-04 | 14-Dec-04 | ||||
| Rudkevich | Dmitry | Chemistry | Sensing Materials for Detection of Cancer-inducing Nitrosating Species | $ 10,000 | University of North Texas Health Science Ctr | 1-Jan-03 | 31-Dec-03 | ||||
| Gao | Jean | Computer Science Engineering | DNA Microarray analysis for Breast Cancer Discovery and Prediction | $ 15,000 | University of North Texas Health Science Ctr | ACS-Institution Research Grant | 1-Jan-04 | 31-Dec-04 | |||
| Tang | Liping | Biomedical Engineering | Nicotine Effect on Angiogenesis | $ 44,918 | TissueGen, Inc. | 15-Dec-03 | 14-Dec-05 | ||||
| Puppala | Anand | Civil Engineering | Field Investigations for Comprehensive Assessments of Four Selected Stabilization Methods for Soft Subgrade Soils from Southeast Arl;ington, | $ 48,859 | City of Arlington | 1-Jan-02 | 31-May-05 | ||||
| Barrett | Edith | School of Urban/Public Affairs | Ripley Amold Housing Development Relocation Project | $ 35,000 | City of Fort Worth | 17-Feb-03 | 31-May-04 | ||||
| Anjomani | Ard | School of Urban/Public Affairs | Building Footprints for the City of Rowlet | $ 5,000 | City of Rowlet | 7-Feb-03 | 6-Feb-04 | ||||
| Kruzic | Andrew | Civil Engineering | Investigation of the Sources & Nature of the Unusual Blue-green Colored Water & White Powder Found in a Storm Water Drainage Channel Near | $ 13,616 | City of Arlington | 6-May-03 | 31-Dec-03 | ||||
| Qasim | Syed | Civil Engineering | Performance Evaluation of Bio-Feed Activator & Treatability of Deicing Fluid in High Rate Anaerobic Digester | $ 55,685 | City of Fort Worth | 1-Oct-03 | 31-May-04 | ||||
| Anjomani | Ard | School of Urban/Public Affairs | Comprehensive Lan Use Plan for Center City/University District Area of the City of Arlington | $ 28,250 | Arlington Chambre of Commerce | 1-Sep-03 | 31-Aug-04 | ||||
| Bright | Elise | School of Urban/Public Affairs | Development Code Research | $ 3,625 | City of Farmers Branch | 12-Jan-04 | 30-Jul-04 | ||||
| Anjomani | Ard | School of Urban/Public Affairs | Base layer Maps | $ 24,000 | City of Rowlet | 12-Mar-04 | 1-Mar-05 | ||||
| Bright | Elise | School of Urban/Public Affairs | Commuter Rail Station Marketability study. | $ 4,100 | City of Fort Worth | 20-Jan-04 | 20-Sep-04 | ||||
| Yuan | Robert | Civil Engineering | Instrumentation of North Central Corridor Aerial Structures | $ 44,492 | Dallas Area Rapid Transit (DART) | 1-Oct-02 | 30-Sep-03 | ||||
| Yuan | Robert | Civil Engineering | Instrumentation of North Central Corridor Aerial Structures | $ 30,118 | Dallas Area Rapid Transit (DART) | 2-Oct-02 | 30-Sep-03 | ||||
| Puppala | Anand | Civil Engineering | Experimental Studies on Flowable Fill and Flowable Fill Base Materials | $ 50,742 | City of Fort Worth | 21-Jun-04 | 31-Dec-04 | ||||
| Maldonado | Theresa | Electrical Engineering | Powre: second Order Nonlinearopticla waveguides fabricated by ionic Self assembly | $ 75,000 | National Science Foundation | 1-Sep-99 | 31-Aug-03 | ||||
| Das | Sajal | Computer Science Engineering | Scheduling and Load Balancing on the Information Power Grid | $ 172,800 | NASA | 1-Jun-00 | 31-Aug-03 | ||||
| Cook | Diane | Computer Science Engineering | Mining structural Data to discover Probabilistic Substructures _ Joseph T. Potts | $ 46,000 | NASA | 1-Sep-01 | 31-Aug-03 | ||||
| Lewis | Frank | ARRI | Visiting scientist Manufacturing engineering laboratory | $ 46,800 | National Institue of Standards and Technology | 1-Sep-02 | 31-Aug-03 | ||||
| Delay | Deborah | School of Social Work | Americorps - UTA year 9 | $ 273,314 | Texas Commission on Volunteerism and Community Service | 1-Sep-02 | 31-Aug-03 | ||||
| Puppala | Anand | Civil Engineering | Gutter Flow 7 Manning Analysis | $ 434,037 | Texas Department of Transportation | 1-Sep-01 | 31-Aug-03 | ||||
| Puppala | Anand | Civil Engineering | The effects of Using compost to Mitigate Shoulder Cracking | $ 262,626 | Texas Department of Transportation | 1-Sep-02 | 31-Aug-03 | ||||
| Walker | Roger | Computer Science Engineering | Improving the ride quality of Portland Cement concrete Pavement | $ 310,000 | Texas Department of Transportation | 1-Sep-01 | 31-Aug-03 | ||||
| Walker | Roger | Computer Science Engineering | Develop amethodology for collecting stop and go Inertial profile measurments | $ 95,716 | Texas Department of Transportation | 1-Sep-02 | 31-Aug-03 | ||||
| Walker | Roger | Computer Science Engineering | Implementation of the Real-time transverse Pavement Profile Measurment system | $ 304,000 | Texas Department of Transportation | 21-Nov-02 | 31-Aug-03 | ||||
| Walker | Roger | Computer Science Engineering | Texture software Hardware enhancements | $ 100,000 | Texas Department of Transportation | 1-Sep-02 | 31-Aug-03 | ||||
| Walker | Roger | Computer Science Engineering | Texas Modular software Enhancements | $ 100,000 | Texas Department of Transportation | 1-Sep-02 | 31-Aug-03 | ||||
| Li | Jianling | School of Urban/Public Affairs | Projected Changes in transportation Demand and system Needs | $ 116,710 | Texas Department of Transportation | 1-Sep-02 | 31-Aug-03 | ||||
| Li | Jianling | School of Urban/Public Affairs | Increasing Use of toll Financing in Texas | $ 92,923 | Texas Department of Tra | ||||||