Team worked to increase productivity and improve facility flow with the evaluation of various automation equipment.
Team reduced the scrap rate for part number 464 in the production line at Fong Kai Industrial.
Team reduce wasted time for crews and introduced an optimal layout using 5S Methodology.
Rendered an average 24-hour OBS throughput time or below when rendering and observation cost to charge.